What Was Tested๏
cardano-node 11.2.0 was tested in the Conway era at protocol version 11, both on
local testnets started directly in Conway and on the public Preview network. Upgrade
testing went from 11.1.3 to 11.2.0 at protocol version 11, so this was a binary upgrade
only, with no hard fork. Separate activities covered Dijkstra protocol version 12,
a local testnet hard-forked from Byron through Conway protocol version 11, and a full
Mainnet sync from genesis.
A โ๏ธ means the activity finished with no unexpected failures. Tests that hit an already known and tracked issue are reported as broken rather than failed, and tests that do not apply to a given configuration are reported as skipped.
Release Testing Checklists๏
โ๏ธ |
|
โ๏ธ |
|
โ๏ธ |
|
Testing in Dijkstra PV12 |
โ [1] |
Testing on Preview |
โ๏ธ |
Upgrade testing (11.1.3 to 11.2.0) |
โ๏ธ |
Rollback testing |
โ๏ธ |
Reconnection testing |
โ๏ธ |
Block-production testing |
โ๏ธ |
Testing on Ubuntu, Debian, Mint |
โ๏ธ |
Shutdown testing (IPC, block synced, slot synced, Ctrl+C) |
โ๏ธ |
โ [2] |
|
Byron to Conway 11 hard-fork testing |
โ๏ธ |
Check build instructions changes |
โ๏ธ |
Regression Testsuite Results๏
Both Conway regression configurations collected the same 2,276 tests with the same outcome: no failures, and nine tests reported as broken because they hit known issues.
Configuration |
Total |
Passed |
Broken |
Skipped |
Failed |
|---|---|---|---|---|---|
2,276 |
1,908 |
9 |
359 |
0 |
|
2,276 |
1,908 |
9 |
359 |
0 |
The default-backend run took approximately 1 h 39 min of wall-clock time, and the disk-backend run took 1 h 47 min. Both used local testnet clusters with three stake pools each. The disk-backend run limited concurrent tests per cluster to five, compared with eight for the default backend.
The suite covers transactions and fees, native tokens and metadata, the mempool, Plutus V1,
V2 and V3, staking, rewards and stake pool lifecycle, KES key rotation, Conway governance,
cardano-cli behavior, node metrics, node configuration, and socket handling.
Known issues hit by both runs (reported as broken):
Issue |
Tests |
|---|---|
cardano-ledger#4566 - repeated certificates stripped from a Conway transaction |
6 |
cardano-ledger#6102 - genesis staking injection leaves |
1 |
cardano-node#4002 - |
1 |
cardano-node#4488 - Plutus debug output does not return the evaluation error |
1 |
These tests are tracked as expected failures. The counts above describe the linked Conway runs, not the separate Dijkstra activity.
What the Checklist Items Cover๏
Default UTxO backend - the whole end-to-end test suite against a local testnet in the Conway era, with the node keeping the UTxO set in memory, which is the node default.
LSM disk UTxO backend - the same full suite, but the node keeps the UTxO set on disk. The on-disk backend changes how ledger state is accessed, so it can expose problems such as query stalls, performance cliffs, and corruption that the in-memory backend hides.
Genesis consensus mode - the same full suite with Ouroboros Genesis instead of the default Praos chain-selection mode. For this tag it was combined with the disk backend in a single run, which is why the two rows link to the same report.
Testing in Dijkstra PV12 - testing in the Dijkstra era at protocol version 12, separately from the Conway protocol version 11 regression runs. This activity exposed the local-submission and guard-signature issues described in footnote [1].
Testing on Preview - a subset of the suite run against the real, long-running Preview network instead of a local testnet, exercising the release against real peers, real traffic, and a chain that cannot be reset.
Upgrade testing - a simulation of a real network upgrade. A cluster is started on the base release, then nodes are upgraded in stages so that the network temporarily runs mixed versions, and the sanity suite is rerun after each step. It catches problems that appear only across versions: configuration and genesis incompatibilities, block diffusion between old and new nodes, Plutus cost model updates, and unexpected log errors.
Rollback testing - the network is deliberately split in two, both halves accept conflicting transactions, and the halves are then reconnected. Two scenarios are checked: reconnecting after enough blocks that the fork must become permanent, and reconnecting early enough that global consensus must be restored and the losing branch rolled back.
Reconnection testing - a block-producing node is stopped and restarted repeatedly; it must rejoin the network, resynchronize, and return its peer-connection metrics to their expected values without manual intervention.
Block-production testing - a long run over many epochs in which pools with equal stake, half of them on the in-memory and half on the disk backend, must produce roughly the same number of blocks. A configuration that silently slows down forging shows up here as a skewed block distribution rather than as a failing assertion elsewhere.
Testing on Ubuntu, Debian, Mint - a regression run inside a container based on a mainstream Linux distribution. The node binaries themselves are still built with Nix and are the same in every distribution; what varies is the surrounding environment: the system configuration, certificates, locale, shell utilities, and filesystem behavior the node and the test framework run on top of.
Shutdown testing - the node is shut down through every supported mechanism (slot-based, block-based, inter-process communication, Ctrl+C) and must exit promptly, log a clean shutdown, and start again afterwards without replaying or corrupting its database.
Sync testing on Mainnet - a full Mainnet sync from genesis, measuring sync time, per-era and per-epoch speed, and CPU and memory usage against previous releases. This is the activity that measures resource consumption at Mainnet scale.
Byron to Conway hard-fork testing - a local testnet started in the Byron era and hard-forked through every intermediate era up to the target Conway protocol version, exercising era translations and hard-fork paths that a testnet started directly in Conway never touches.
Check build instructions changes - building the node from source in a clean container by following the published build instructions, to confirm those instructions are still correct for the tag.
Scope and Limits๏
Preview runs only a subset of the suite. A Preview epoch lasts two hours, so tests that wait for an epoch boundary or span several reward cycles are excluded. Preview also runs against a single node that joins the network, and the cluster is never restarted during the run.
Upgrade testing for this tag did not include a hard fork. The upgrade from 11.1.3 to 11.2.0 stayed at protocol version 11, exercising the binary upgrade and mixed-version period. The separate Byron to Conway activity covered hard-fork handling through protocol version 11; it did not cover a hard fork to Dijkstra protocol version 12.
The 359 skipped tests do not apply to these regression configurations. Examples include tests for other eras, other UTxO backends, or components not enabled in the run. Their count should not be read as successful coverage of those other configurations.
The passing Conway runs do not imply a passing Dijkstra result. The Dijkstra checklist item remains unsuccessful because of the two issues in footnote [1]. The proposed guard-signature fix has not been confirmed by a passing result in this report.
The Mainnet sync verdict remains qualified. Peak resident memory reaches 22.08 GiB, 4.4% above the measured 11.1.1 run and 43.1% above the historical 11.0.1 baseline. Sync takes 132,111 s, 19.4% longer than 11.1.1. The runs also differ in consensus mode, snapshot settings, and chain endpoint, so these differences cannot be attributed to node code alone. See the Mainnet sync report for the comparison and its limits; memory issue #3670 remains open.
Build-instruction testing is still pending. Its hourglass status is not a passing result.